Home/ Zypto App/ EVM wallet

The EVM wallet built for every chain.

Zypto App is a non-custodial EVM wallet supporting Ethereum, Base, Arbitrum, Optimism, Polygon, BNB Chain and more EVM-compatible networks. Swap instantly with built-in Uniswap and Chainlink CCIP, then spend it in the real world, all from one app.

Zypto App EVM wallet running on Android and iOS
EVM chains10+
Assets24,000+
Cross-chain swap routes1M+
Seed phrasesJust one
How it works

EVM, without leaving the app

Built-in Uniswap and Chainlink CCIP

Swap EVM tokens in two taps via built-in Uniswap and Chainlink CCIP, all inside Zypto App.

Cross-chain from EVM out

Move assets EVM-to-EVM via Chainlink CCIP, or out to Bitcoin, Solana and XRP through built-in aggregators. 1M+ routes, no external bridges.

One seed phrase

One non-custodial backup covers every EVM chain and 20+ blockchains. Create unlimited wallets, all from a single seed phrase.

Spend it anywhere

Whatever EVM chain you hold, top up the Zypto Premium Visa Card, pay bills, buy gift cards and top up phones.

What is an EVM wallet?

The Ethereum Virtual Machine (EVM) powers most of the blockchains that define Web3 today. An EVM wallet is a digital wallet that stores, sends and manages assets on Ethereum and every EVM-compatible chain, from Base and Arbitrum to Optimism, Polygon and BNB Chain. EVM wallets support ERC-20 tokens and let you interact directly with dApps, smart contracts and DeFi protocols across the ecosystem.

Zypto App brings every EVM chain into one non-custodial wallet, so you are not running a separate app per network. Your keys are generated and stored on your device, while Zypto handles the complexity of talking to each chain behind the scenes.

Why one EVM wallet matters

Most Web3 activity now happens across more than one EVM chain, cheap gas moves from network to network, and the tokens you want rarely all live in the same place. Juggling a wallet per chain, or a browser extension per dApp, means more seed phrases to lose and more chances to send funds to the wrong network.

One EVM wallet removes that friction. Zypto provides over 1 million cross-chain swap routes, so stablecoins and any of 24,000+ crypto assets can move wherever they are needed, all from a single balance and a single backup.

Get started in 3 steps

From one EVM chain to every chain

1

Get the app

Download Zypto App and set up your non-custodial EVM wallet in under a minute. It's free and supports 25+ languages.

2

Add your EVM assets

Generate an EVM address, receive from another wallet, or buy in-app through 130+ fiat onramps.

3

Swap and spend

Swap instantly with built-in Uniswap and Chainlink CCIP, or go cross-chain to non-EVM assets, then spend via the Zypto Premium Visa Card, bill pay, gift cards and mobile top-ups.

EVM chain coverage

10+ EVM networks, one wallet

Browse all assets

New EVM chains are added regularly.

EVM tokens

Buy, send, swap and manage any EVM token

Every supported EVM asset has a dedicated wallet page for buying, selling, sending, receiving, swapping and tracking your portfolio, not just holding it. Tap one to get started, or browse the full EVM token hub.

EVM wallet FAQs

What is an EVM wallet?

An EVM wallet is a digital wallet that stores, sends and manages assets on Ethereum and every EVM-compatible blockchain. It supports ERC-20 tokens and lets you interact directly with dApps and smart contracts.

Does Zypto App support all EVM blockchains?

Zypto App supports every major EVM blockchain, including Ethereum, Base, Arbitrum, Optimism, Polygon and BNB Chain, along with all EVM tokens. New EVM chains are added regularly.

Can I swap EVM tokens inside Zypto App?

Yes. You can swap EVM tokens instantly through the built-in Uniswap DEX or Chainlink CCIP, or perform cross-chain swaps to non-EVM assets via ChangeNOW, all without leaving the app.

How long do EVM swaps take to complete?

Swaps through Uniswap and Chainlink CCIP are almost instant, while cross-chain swaps to non-EVM assets typically take between one second and five minutes depending on the blockchain and network activity. All transactions appear in your Pending section until confirmed onchain.

Can I create multiple EVM wallets in Zypto App?

Yes. You can create as many wallets as you like, all for free. Each wallet supports multiple blockchains, including every EVM network.

Can I secure my EVM wallet with the Vault Key Card?

Yes. The Vault Key Card provides optional cold storage for up to three wallets, including EVM chains. It authorises transactions only when tapped to your device.

Share

What Zypto users say

Excellent 4.6 based on 148 reviews Read all reviews on Trustpilot